Gabinete da Área de Sines
1941/2006
14
Projeto portuário
1963-08-16/1995
1
Plano Geral do Porto de Sines
1963-08-16/1995
003
Desenvolvimento da Empreitada 13/80 - Reformulação do plano geral do posto de Sines (PRC Harris)
1971/1995
00001
PRC Harris - Port and cargo handling costs - Selected european ports - Analysis and back up information
1983-01/1983-01
00002
Review of master plan studies
1984-01/1984-01
00003
Methodology for computing wave climate in port
1971/1995
00004
Record pf hydraulic and geotechnical reports by swl with summary and conclusions
1984-01/1984-01
00005
Contract documents for development of a master plan - Design of a breakwater protection - Design coal terminal and ancillary facilities - Volume 2 - Technical data
1981-05/1981-05
00006
Port of Sines Master Plan - Revision 1 - Volume 2 - Port Service Demand Study
1983-07/1983-07
00007
Port of Sines Master Plan (Final draft) - Revision 1 - Volume 3 - Evaluation of site conditions and port planning criteria
1983-07/1983-07
00008
Port of Sines - Specification BM-104 - Railcar Loader - Final Draft
1985-01/1985-01
00009
Port of Sines - Coal terminal - Railcar Loader - Addendum n.º 1
1985-01/1985-01
00010
Port of Sines - Private & Confidential - Assessment of costs to handle 3 mill 4 mill and 6 mill tons of coal through Sines over a single discharge berth
1984-08/1984-08
00011
Custos de Utilização do Porto de Sines
1984-11/1985-05-16
00012
Port of Sines - Tender Evaluation Report - Confidential
1984-01-27/1984-03-14
00013
National coal distribution study - Portugal - Volume 1
1981-06/1982-12
00014
Port of Sines - Relatório de avaliação das propostas - Confidencial
1984-02-28/1984-03-13
00015
Concept Master Plan for the expansion of Port of Sines
1981-08/1984-06-04
00016
National coal distribution study - Portugal - Volume 2 - Appendices
1981-06/1982-05
00017
Porto de Sines - Porto de Carga Geral e Terminal de Carvão - Trabalhos Marítimos
1983-03/1983-03
00018
Porto de Sines - Porto de Carga Geral e Terminal de Carvão - Trabalhos Marítimos
1983-03/1983-03
00019
Porto de Sines - Porto de Carga Geral e Terminal de Carvão - Trabalhos Marítimos
1983-03/1983-03
00020
Porto de Sines - Terminal de Carvão - Equipamento de Manuseamento de Carvão - Contrato 2
1984-10/1984-10
00021
Porto de Sines - Terminal de Carvão - Equipamento de Manuseamento de Carvão - Contrato 2
1984-10/1984-10
00022
Development of a master plan, design of a breakwater protection and design of terminals for the Port of Sines - Volume 1 - Terms of reference
1980-02-28/1980-02-28
00023
Port of Sines Master Plan (Final draft) - Revision 1 - Volume 1 - Executive summary
1983-07/1983-07
00024
Port of Sines Master Plan - Volume 8 - Port Financial Study
1983-06/1983-06
00025
Port of Sines - Relatório de avaliação das propostas - Anexos - Confidencial
1984-02/1984-02
00026
Port of Sines Master Plan (final draft) - Revision 2 - Volume 7 - Project costs and implementation
1983-07/1983-07
00027
Contract job n.º CG-13/80 - Development of the new master plan and design of priority works for the Porto of Sines
1987-04/1987-04
00028
Port of Sines - West Breakwater Rehabilitation - Optimisation Study - Draft Final Report May 1986
1986-05-28/1986-05-28
00029
Port of Sines - West Breakwater Rehabilitation - Optimisation Study - Draft Interim Report April 1986
1986-04/1986-04
00030
Port of Sines - West Breakwater Rehabilitation - Optimisation Study - Draft Final Report May 1986
1986-05-28/1986-05-28
00031
Port of Sines Master Plan (Final draft) - Revision 1 - Volume 4 - Port requirements
1983-07/1983-07
00032
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1981-12/1981-12
00033
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1981-06-01/1981-06-27
00034
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1981-09-27/1981-10-31
00035
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1983-07-01/1983-07-31
00036
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1983-07-31/1983-08-27
00037
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1983-08-28/1983-10-01
00038
Porto de Sines - Porto de Recreio - Nota Técnica
1983-07-08/1983-10-11
00039
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1981-11-01/1981-11-28
00040
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1981-11-29/1982-01-02
00041
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1982-01-03/1982-01-30
00042
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1982-01-31/1982-02-27
00043
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1982-02-28/1982-04-03
00044
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-03-31/1985-04-27
00045
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-04-28/1985-06-01
00046
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-09-01/1985-09-28
00047
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-09-29/1985-11-02
00048
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-12-01/1985-12-28
00049
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-03-30/1986-04-26
00050
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-04-27/1986-05-24
00051
Porto de Sines Portugal - Porto de Carga Geral e Terminal de Carvão - Trabalhos Marítimos - Proposta de Preço (Anexo I) - Volume 1 of 2
1983-06-02/1983-06-02
00052
Port of Sines Master Plan (Final draft) - Volume 2 - Port service demand study
1983-05/1983-05
00053
Port of Sines Master Plan (Final draft) - Volume 3 - Evaluation of site conditions and port planning criteria
1983-05/1983-05
00054
Port of Sines Master Plan (Final draft) - Volume 4 - Port requirements
1983-05/1983-05
00055
Porto de Sines - Porto de Carga Geral e Terminal de Carvão - Trabalhos Marítimos
1983-03/1983-03
00061
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1982-05-30/1982-07-03
00062
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1982-07-04/1982-07-31
00063
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-04-28/1985-06-01
00064
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-05-25/1986-06-28
00065
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-10-26/1986-11-22
00066
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1987-01-01/1987-01-24
00067
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1988-01-01/1988-01-22
00068
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1988-01-24/1988-02-20
00069
Port of Sines - Relatório de avaliação das propostas - Fevereiro 1984 - Confidencial
1984-02-28/1984-03-13
00070
Port of Sines Master Plan (Final draft) - Revision 1 - Volume 4 - Port requirements
1983-07/1983-07
00071
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1983-10-02/1983-10-29
00072
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1984-04-29/1984-05-26
00073
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1984-07-29/1984-08-25
00074
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1984-09-30/1984-10-27
00075
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1984-11-25/1984-12-29
00076
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-06-02/1985-06-29
00077
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-06-30/1985-07-27
00078
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-07-28/1985-08-31
00079
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-11-03/1985-11-30
00080
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1985-12-29/1986-01-25
00081
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-01-26/1986-02-22
00082
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-02-23/1986-03-29
00083
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-03-30/1986-04-26
00084
Contract Job n.º CG-13/80 - Development of the New Master Plan and Design of Priority Works for the Port of Sines
1986-04-27/1986-05-24
000056
Embase - Styles 5 - Poulie - Sup. et Inf. - Bras 24" x 101'
1978-02-01/1978-02-01
000057
Tube interne & tube externe - Bras 20" x 90'
1978-01-31/1978-01-31
000058
Embase - Styles 5 - Poulie - Sup. et Inf. - Bras 20" x 90'
1978-01-30/1978-01-30
000059
Tube interne & tube externe - Bras 24" x 101'
1978-02-01/1978-02-02
000060
Tube interne & tube externe - Bras 24" x 101'
1978-02-01/1978-02-02
Desenvolvimento da Empreitada 13/80 - Reformulação do plano geral do posto de Sines (PRC Harris)
Description level
Series
Reference code
PT/ADSTB/AC/GAS/14-1/003
Title type
Atribuído
Date range
1971
to
1995
Dimension and support
84 cad.; papel
Physical location
21
Language of the material
Português
Creation date
08/09/2020 10:55:50
Last modification
28/09/2020 14:30:52